The Schletter tile kit has one of the thickest profiles on the market. Note the assymetrical arrangement of holes for the batten screws - allowing for better bracing; note also the green packing shimm - allowing for a perfect alignment of the kit an…

The Schletter tile kit has one of the thickest profiles on the market. Note the assymetrical arrangement of holes for the batten screws - allowing for better bracing; note also the green packing shimm - allowing for a perfect alignment of the kit and hence preventing "pressing" down and damaging the tile above. Schletter enables a quality and long-lasting finish.

Cable carefully tied so as not to be on the roof.

Cable carefully tied so as not to be on the roof.

DC Isolator not fixed to module and has a shroud. Note the PA6 conduit and IP69 gland.

DC Isolator not fixed to module and has a shroud. Note the PA6 conduit and IP69 gland.

Cable between rows in conduit and secured with stainless steel ties for longevity.

Cable between rows in conduit and secured with stainless steel ties for longevity.

4kWp solar PV plant installed in Mount Waverley, Victoria using 16 x 265Wp WINAICO modules, SMA inverter, Schletter mounting and Huber & Suehner DC cable

"Recently, I had a 4kW solar PV system installed by iEnergytech.  

I chose this company after a great deal of research to determine what factors were important in a solar system and after speaking to and getting quotes from others.  

Mine was not a straight forward, single array system and it was important to get the design right.  I chose iEnergytech because they were prepared and able to do a quality and effective job in a very professional manner.  

I knew at the moment I received the quote exactly what materials would be used, the design and the tools which would be used.  

One of the factors I found very impressive was receiving a custom manual after completion of the job--not a folder full of “off the shelf” brochures--but a manual specific to my system with all the information I might need for operating and maintaining the system in an effective way.  This included graphs and other data generated specifically for this job.   

I have no hesitation in recommending the company"


AW—Mt. Waverley, February, 2013